|
SPECIFICATIONS OF SRR RESIDENCY |
|
Plot Area |
: |
Framed Structure: R.C.C. Framed structure to withstand wind &
seismic loads |
|
Super
Structure |
: |
First Class Brick Masonry in Cement Mortar (1:6) Prop. |
|
Main Door |
: |
Teak Wood frame & shutter aesthetically designed with melamine
polishing & hardware of reputed make. |
|
Internal
Doors |
: |
Teak Wood Frame with moulded paneled shutter doors with fittings
of reputed make |
|
Windows |
: |
Teak Wood Frame and Teak Wood shutter |
|
Grills |
: |
M.S. Grill, aesthetically designed and fixed to the window frames. |
|
Floors |
: |
First quality vitrified Tiles (24" X 24") in Bedroom, Living,
Dining & Kitchen
Bathrooms: Acid resistant Anti Skid Ceramic Tiles |
|
Tiles
Cladding: |
: |
Dadooing in Kitchen:
Glazed Ceramic Tiles dado upto 2'-0' height above kitchen platform
Bathrooms:
Glazed Ceramic tiles dado Johnson/Bell or equivalent upto door
height.
Utilities/Wash:
Glazed Ceramic tile dado upto 3'-0' height. |
|
External
Painting |
: |
Two coats exterior Acrylic Emulsion Paint of Asian/ICI or
equivalent over a coat of primer. |
|
Internal
Painting |
: |
Smooth wall putty finish with Acrylic Emulsion paint of Asian/ICI
or equivalent over a coat of
primer. |
|
Kitchen |
: |
Granite Platform with Stainless steel sink with soft water
connection & provision of fixing of Aqua guard. |
|
Utilities /
Wash |
: |
Provision for washing machine & wet area for washing utensils etc. |
|
Toilets |
: |
All toilets will consists of Wash Basin
EWC with flush tank of Hindustan/Parry ware or equivalent make.
Hot and cold wall mixer with shower
Provision of geysers in all Toilets.
All C.P. Fittings are chrome plated of Mark or equivalent make. |
|
Electrical |
: |
Concealed copper wiring of Finolex/Anchor or equivalent make.
Power outlets for Air Conditioners in all Bedrooms. Power outlets
for geysers in all bathrooms.
Power plug for cooking range chimney, refrigerator, microwave
ovens, mixer/grinders in kitchen.
Plug points for T.V. & Audio Systems etc. 3-Phase supply for each
unit and individual meter boards.
Miniature Circuit Breakers (MCB) fo each Distribution boards of
MDS or equivalent make.
Switches are of Toyoma/Anchor or equivalent make. |
|
Telecom |
: |
Telephone points in master bedroom, living & dining areas,
Intercom facility to all the units connecting security. |
|
Cable TV |
: |
Provision for cable connection in Master Bed room & Living Room |
|
Internet |
: |
One Internet provision in each flat. |
|
Lifts |
: |
TWO No.s of High Speed Passenger Lifts with V3F for energy
efficiency. |
|
Generator |
: |
Total backup except power sockets, A/C's, Geyser. |
|
Project
Duration |
: |
Project shall be completed in 2years from the date of Approval |
|
Water Treat.
Plant |
: |
Bore water converted to soft water through water softeners &
distributed through pneumatic pressure pumps. |
|
Amenities |
: |
Club House, Gym & Swimming Pool (on membership only) |